.
On 12 December 2008, Terence moved in together with our pet dog, Can Can. Yes, we bought a dog, a miniature schnauzer and she moved in together with Terence.
We were so busy with preparing the house for their moved-in and are so busy with Can Can and thus the lack of updates here. Well, I promised I will update them soon so that this blog will end beautifully since our house renovation had came to an end.
Now we are just waiting for our big day on 14 June 2009, the day we start our new life together and hopefully everything will stay perfect till the day we leave this world.
Friday, May 15, 2009
Monday, November 17, 2008
Delivery of Ikea loots
.
Ikea have delivered those loots we bought on Friday, was really shocked that they are all very heavy!
Gonna spend next Saturday at our new house doing the assemble liao...
Oh ya, we also went Besglas and have selected the colour for our Alumix wardrobe door... really got no idea how it will turn out to be >_<
Ikea have delivered those loots we bought on Friday, was really shocked that they are all very heavy!
Gonna spend next Saturday at our new house doing the assemble liao...
Oh ya, we also went Besglas and have selected the colour for our Alumix wardrobe door... really got no idea how it will turn out to be >_<
Saturday, November 15, 2008
Delivery of Hood, Hob n Oven
.
Waited at our new house for the delivery of hood, hob and oven from Goh Ah Bee. Anyway this is what we bought:
Hood - Fujioh FX900 ($350)
Hob - Fujioh FG772SVGH ($320)
Water Storage Heater - Joven JH25 ($240)
Oven - Brandt FC642XF1 ($1050)
Also took the chance to take photos of the lights installed without flash cos' previous photos are all taken at night with flash so can't really see the design =P
Waited at our new house for the delivery of hood, hob and oven from Goh Ah Bee. Anyway this is what we bought:
Hood - Fujioh FX900 ($350)
Hob - Fujioh FG772SVGH ($320)
Water Storage Heater - Joven JH25 ($240)
Oven - Brandt FC642XF1 ($1050)
Also took the chance to take photos of the lights installed without flash cos' previous photos are all taken at night with flash so can't really see the design =P
Friday, November 14, 2008
Shopping at Ikea
.
We are still waiting for our carpentry to be up, seems like work have stopped since the installation of lights =/
We went Ikea today to purchase a study table, sofa bed and display shelf all to be placed in our study room =)
Since the loots are too big and heavy to carry back on our own, we have no choice but to opt for delivery which cost us $55. Lucky the next delivery date is on Sunday so we dun need to take leave specially for this...
We are still waiting for our carpentry to be up, seems like work have stopped since the installation of lights =/
We went Ikea today to purchase a study table, sofa bed and display shelf all to be placed in our study room =)
Since the loots are too big and heavy to carry back on our own, we have no choice but to opt for delivery which cost us $55. Lucky the next delivery date is on Sunday so we dun need to take leave specially for this...
Tuesday, November 11, 2008
Renovation Day 13
.
Finally lights are installed... but the dining area cove lightings and dining light are not installed yet. We can understand that he may want to install the dining light at a later stage due to dust but not sure why the cove lightings are not installed yet since the rest are already installed.
Got one small issue; Kenneth told us that one of the kitchen light cover is chip off and I went to take a look and confirmed that it wasn't like that when we received it last weekend. Told kenneth about it and he said something like if we are sure it wasn't like that before, then he will replace one for us. Told us to call the lighting shop to reserve and he will go and buy it...
The stupid fixed panel window is also replaced with sliding window liao... happy!
Saw that the gas piping is up too, aiya so ugly...
Next thing up will be carpentry liao =)
Finally lights are installed... but the dining area cove lightings and dining light are not installed yet. We can understand that he may want to install the dining light at a later stage due to dust but not sure why the cove lightings are not installed yet since the rest are already installed.
Got one small issue; Kenneth told us that one of the kitchen light cover is chip off and I went to take a look and confirmed that it wasn't like that when we received it last weekend. Told kenneth about it and he said something like if we are sure it wasn't like that before, then he will replace one for us. Told us to call the lighting shop to reserve and he will go and buy it...
The stupid fixed panel window is also replaced with sliding window liao... happy!
Saw that the gas piping is up too, aiya so ugly...
Next thing up will be carpentry liao =)
Subscribe to:
Posts (Atom)